|
Case Study
Faceparty |
 |
Brief: This derelict building houses offices and meeting spaces and was entirely constructed and distressed on site. The themed offices also contain a tree house and bunker all of which were built around the existing structure of the building. All units were visualized and structurally engineered, with pre built elements installed and dressed on site.
|
|
|
|
 |
|
 |
|
 |
|
 |
|
|