Super tight installation schedules are no problem when all elements are precision engineered and tested off site. A 40 ft catwalk round the Natural History Museum’s iconic diplodocus in less than 1 hour or 4 giant beds on 3 continents installed simultaneously for a successful world record attempt with Olympic medalist trampolinists, or a 2 storey slide for the launch of Windows 8 manufactured to fit exact stair profiles installed overnight at Bluewater shopping Centre.
– Time and space to test fit of all elements
– Organised workshop allowing safe high speed production
– Specialist tools for finishing in paint, plastics and metal
– Labelling, wrapping and packing enabling efficient loading and fast assembly