Lynx Shower
Experiential
Working with the Lounge Group and Mischief PR the in-house Helix team designed, prefabricated and installed a colossal 40ft tall working shower. The prefabrication took a total of eight days. The World Record was smashed with a grand total of 153 lucky men and women receiving a genuine hot shower experience